Canada's warmest welcome ®* April 9 2020

Traffic Delays on Lake Osoyoos Bridge Hwy 3

osoyoos, canada's warmest welcome

Share page

Text size reduce text size increase text size Share page Facebook Twitter LinkedIn

Hootenanny for Hospice Fundraiser March 14 POSTPONED

Oliver Osoyoos Wine Country Pig Out Festival May 2

FOODSAFE Course March 2, 2020

Spring Market April 3 and 4 CANCELLED

Elvis on Tour Concert April 10, 2020

Art Gallery Opening Reception for Beauty Is In March 7

Canada's Desert at the Osoyoos Library March 11

POSTPONED Large (Bulky) Items Curbside Garbage Collection

This project was completed on December 20, 2013.


Traffic Advisory of Construction Activities on Lake Osoyoos Bridge 
Traffic delays due to construction can be expected through the Lake Osoyoos Bridge, in the Town of Osoyoos on Highway 3.  Purpose for the construction is to install a new sidewalk on the North side of the Bridge to mirror the South side of the Bridge.

Duration: November 4 to December 15, 2013

Emergency vehicles will be given priority. 

If you require further information contact:

Cumming Construction Ltd.
2362 Government Street
Penticton BC  V2A 4W6
(T) 250.492.5955
(F) 250.492.5977

Event date: 
Sunday, 15 December, 2013
Archived
News item
While every reasonable effort is made to ensure the accuracy of this data, we are not responsible for any errors or omissions contained on these pages. Please verify any information in question with the Town of Osoyoos.   Town of Osoyoos
Box 3010, 8707 Main Street
Osoyoos, BC V0H 1V0
(TF) 1.888.495.6515
(T) 250.495.6515
(F) 250.495.2400
(E) info@osoyoos.ca

 

Mission Statement
To provide quality community services and facilities, which meet the needs of the current
and future residents of Osoyoos, in a socially, economically and environmentally sustainable manner.

Copyright © 2013 Town of Osoyoos All Rights Reserved. Powered by CivicWeb CMS - Copyright © 2013 iCompass Technologies Inc.